Quality
-
상품 정보
상품 상세설명

-
01
Ordering of castings
Review production orders and place orders for castings.
-
02
Quality inspection
Confirm whether there are any defects and check for reordering.
-
03
Casting process
Formation of external molds and basic casting.
-
04
Outsourcing processing
Processing by specialized external partner companies.
-
05
Independent processing
Precision machining using CNC multitasking machines.
-
06
Part inspection
Inspection of dimensions for both outsourced and internally processed parts.
-
07
Leak Test
Hydraulic testing to check for air bubbles or leaks in the casting.
-
08
Finishing work
Final finishing and assembly preparation for parts that passed inspection.
-
09
Primary Painting
Primary external painting of individual parts.
-
10
Assemble Standby
Classification and organization of parts for assembly.
-
11
Assembly
Precision assembly of parts according to the request form.
-
12
Initial testing
1st Performance Test: Checking capacity, vacuum degree, load, and assembly status.
-
13
2nd Painting
Masking the top of the pump and base, followed by undercoating.
-
14
Final Painting
Final painting according to specific corporate requirements.
-
15
System assembly
Full system construction including piping and accessory installation.
-
16
Secondary testing
2nd Operational Test: Testing all components including instrumentation.
-
17
Factory Inspection
Final comprehensive inspection of product status before shipment.
-
18
Delivery
Secure packaging, warehousing, and final delivery/shipment.
-
01
Ordering of castings
-
사용후기
등록된 사용후기
사용후기가 없습니다.
-
상품문의
등록된 상품문의
상품문의가 없습니다.
-
배송/교환정보
배송
배송 안내 입력전입니다.교환
교환/반품 안내 입력전입니다.
ENG

